Our project highlights
For a list of SENET's projects, see below
SENET has executed some unique studies and projects throughout Africa and the world, and in the process gained valuable knowledge which it applies towards guaranteeing the success of new projects, and completing future studies with increased efficiencies and reduced schedules.
worldwide
Unique Features:
First Gold Heap Leach Plant carried out by a South African Company.
Unique Features:
First process plant to be erected in Eritrea.
Unique Features:
Incorporated SENET proprietary equipment for Heap Leach Stacking.
Unique Features:
Longline Conveyor Protection
Unique Features:
41 off 40m Gantry bridges for land assembly and barge placement 220m curved conveyor to eliminate an additional transfer point and conveyor
Unique Features:
Blasting of the 70m by 30m deep cave
Unique Features:
R.O.M bin had a side tip arrangement with an inclined, self cleaning grizzly
Unique Features:
The largest circular flotation plant in Southern Africa, with 18 X 130m tank cells with 160kW motors
Unique Features:
Crushing, Agglomeration and Stacking Equipment.
Unique Features:
Crushing, scrubbing, milling, leach, CIP elution, electrowinning and gold smelting, 12 kilometres of overland pipelines for raw water, tailings, return water and process water
Unique Features:
100,000 ton Mass Flow Hoppers and Belt Feeders
Unique Features:
Dry tailings due to water shortage in the area
Unique Features:
First plant in RSA to use circular flotation cells and the plant was designed to minimise operating staff
Unique Features:
Pipe Conveyors utilised
Unique Features:
2000tph / Coal
Unique Features:
Drums required FEA and Dynamic Analysis, and special retaining devices and structures due to seismic conditions
Unique Features:
Specialised Chute Design and Test Work for 90 degree transfer points.
Unique Features:
Skid mounted grasshopper conveyors
Unique Features:
Completed on time within budget
Unique Features:
Incorporated SENET proprietary equipment for heap leach, i.e. cement handling, agglomeration drum and complete stacking system
Unique Features:
Incorporated SENET proprietary equipment for heap leach, i.e. cement handling, agglomeration drum and complete stacking system
Unique Features:
Crushing, scrubbing, milling, leach, CIP, elution, electrowinning and gold smelting
Unique Features:
The Design & Engineering is 3D Model based with interfacing with other Suppliers being the major challenge.
Unique Features:
Hydraulic gull wing slewing wheels
Unique Features:
Process building incorporating, 7 Disc Filters, 6 Low Intensity Magnetic Separators, 6 Vacuum Pumps, Cooling plant
Unique Features:
80 000 tons per month
Unique Features:
Crushing, scrubbing, milling, leach, CIP elution, electrowinning and gold smelting
Unique Features:
The project is in the middle of the Sahara desert which made the construction and erection a very challenging task
Unique Features:
The project is in the middle of the Sahara desert which made the construction and erection a very challenging task.
Unique Features:
Skid mounted grasshopper conveyors
Unique Features:
The largest grasshopper type heap leach stacking system regarding tonnage
Unique Features:
Remote location in mountains of the North of the DRC.
Unique Features:
Extreme temperature variation – minus 45 to plus 45 Celsius
Unique Features:
SENET proprietary equipment for heap leach, i.e. cement handling, agglomeration drum and complete stacking system.
Unique Features:
Fully Automated, Hydraulically Self Driven/Steering, Crawler mounted Tripper c/w luffing cross conveyor which luffs between a discharge height of 4 to 12m
Unique Features:
Fully Automated, Hydraulically Self Driven/Steering, Crawler mounted Tripper c/w luffing cross conveyor which luffs between a discharge height of 4 to 12m
Unique Features:
Fully Automated, Hydraulically Self Driven/ Steering, Crawler mounted Tripper c/w luffing cross conveyor which luffs between a discharge height of 4 to 12m


Ayanfuri Gold
Bisha Mine Project
Cerro Mojon
Chuqui Mina Sur
Emal Aluminium Smelter
Finsch Underground Mine
Kalsaka Gold Mine
Lefa Corridor Gold Project
Mowana (Dukwe) Mine
Nova Chimangola Ship Off-loading
San Martin Agglomeration Drums
Snim 2700 TPH Radial Stacker
Trekkopje Heap Leach Uranium
Twangiza Gold Mine
Varvarinskoye
Yatela Gold
Zarafshan O/Land Conveyors & Mobile Tripper
3D Engineering, Modelling & Design
Studies
Gold Process
Heap Leach Proprietary Equipment