OVERVIEW
The project consisted of R.O.M tip, primary crushing with MMD 500 sizer, Apron Feeder, 5 X 750mm wide overland conveyors, 2 x 900mm wide slewing conveyors, 5 x 900mm wide grasshopper conveyors, 1 X 900mm wide transverse conveyor, 1 X 900mm wide stacker feed and 1 X 900mm wide self leveling 40 metre stacker stacking to 12 metre heap height.
The project was carried out in a nine month total project duration, with SENET being responsible for all design, supply, manufacture, shipping, and construction supervision.

Cerro MojonBULK MATERIALS HANDLING/ GOLD HEAP LEACH

PROJECT SUMMARYIN A NUT SHELL